Initially TRITEC conducted a feasibility
study to determine the best control system architecture
liaising with the mechanical design team from Hyde
Group to achieve the best solution for the automated
precision actuators.
TRITEC was responsible for the electrical system
design, specifying, sourcing and procuring the components
used, as well as the control system software design
and screen-based user interfaces.
Installation and commissioning took place over 3
months to very tight timescales and involved installing
over 4,000 metres of cable, 8 Display Pedestals and
8 Card readers.
Once the jig was up and working TRITEC provided on-site
support during the first aircraft build and then undertook
a series of training courses for the electrical and
software systems. <<